Objective:
To provide the evaluating team with a framework for
ensuring a vendor's quality and reliability assurance programs can
satisfy project requirements.
High-reliability space ASIC programs have stringent and unique
requirements that not all ASIC vendors can meet. Government
qualification programs set requirements for quality and reliability
that parts must meet. Government qualified vendors are therefore
one major source of high-reliability parts.
This chapter discusses two areas, the general support of government
qualification programs for ASIC quality, and the specific support of
ASIC quality through proper design methodology. ASIC designers
and their managers must have access to and utilize a design
methodology that supports reliable design.
When evaluating a vendor for space ASICs, we recommend the team
first look at whether the vendor qualifies under the
QML or the QPL government programs. Among
other things, these programs extensively analyze a vendor's quality
and reliability. They also standardize the way a vendor gathers and
presents data. This reduces the learning curve required to
understand each new vendor's way of doing their technical
business.
Obtaining ASICs for high-reliability applications requires the vendor
and designer to deliver much more evidence of the part's reliability
than most commercial ASICs require. Obtaining ASICs for
high-reliability applications, obliges users to go beyond simply
trusting the vendor's reputation and data book. The users must
deliver data to their sponsors showing that all parts they use in an
application, both off-the-shelf and ASIC parts, have the required
pedigree.
The documents describing QML and QPL, MIL-I-38535 and
MIL-M-38510/605/606/607/608, respectively, give a detailed
description of the kinds of data the vendors must make available to
users and to the government. These documents, to some extent, also
call out the format for this information. This makes the pedigree
information available to those users required to deliver the ASIC.
Vendors who are not government qualified may not be able to
produce pedigree information in a timely, complete, accurate, or
easily understood fashion. Nonetheless, we advocate
evaluating high-volume commercial vendors if they can
meet the requirements of your program. However, when
the contract requirements include proven reliability
information, you may find that commercial vendors charge
more and take longer to deliver the reliability information and
associated parts than they would for their standard product and
generic data book reliability information. After factoring in the
entire ASIC program life cycle costs, commercial vendors may end up
costing more than government-qualified vendors.
Both the QPL and the QML ASIC certification/qualification programs
require quite extensive reliability analysis before the government
grants qualification status. The quality and reliability analysis
confirms that a vendor and/or a device meets the relevant
government standards.
"Based on Total Quality Management, QML helps ensure
high quality and reliability as well as cost effective parts."
QML and QPL are high-level programs, described by MIL-I-38535
and MIL-M-38510, respectively. Both QML and QPL refer to a
number of additional MIL-STD documents. For example,
MIL-STD-883 lists the details of test and screening methods used to evaluate quality and reliability of
microcircuits for both the QML and QPL programs. The following list
shows documents used in describing government microcircuit quality
programs:
- MIL-I-38535: Integrated Circuits (Microcircuits) Manufacturing,
General Specification for
- MIL-M-38510: Microcircuits, General Specification for
- MIL-STD-883: Microelectronics, Test Methods and Procedures for
- MIL-STD-976: Microcircuits, Certification Requirements for JAN
- MIL-STD-977: Microcircuit Line Certification, Test Methods and
Procedures for
- MIL-STD-1331: Microcircuits, Parameters to be Controlled for the
Specification of
For each device type requiring qualification there has to be:
- process line certification
- inspection during manufacture
- screening tests
The government originally created the QPL program to maintain the
high quality and reliability of discrete parts. Though a lengthy
process, once QPL qualified, the parts can be produced cost
effectively and speedily, providing the design and the process does
not change. When industry introduced ASICs, their low volume and
application-specific nature led to modification in the standard QPL
program.
To address the issues of ASICs, MIL-M-38510/605, 606, 607, and
608 defined a generic gate array qualification approach. The gate
array program quality system and process requirements ensure the
entire product family qualifies and consistently meets the same
design rules and process controls. The government uses a Standard
Evaluation Circuit (SEC) to evaluate, maintain, and control the process
reliability for the product family. Performing life testing on the SEC
generically qualifies the product family. This approach reduces cost
and shortens qualification cycle time.
The alternative QML program, MIL-I-38535, introduces a new
concept. A manufacturer performs a self audit based on Total
Quality Management (TQM). This management approach calls for
establishing a quality management (QM) plan,
and forming a technology review board (TRB). The desired quality
and reliability levels are maintained through tools, such as, statistical
process control (SPC), process monitors, parameter monitors,
technology characterization vehicles (TCVs), and SECs. MIL-I-38535
provides details about these tools.
Once the program is in place the government certifies a
manufacturing process flow. This certification means that parts can
be produced on that flow, with less cost and a much shorter
qualification cycle time. Thus the government certifies a vendor's
process flow rather than a vendor's product family. The desired
goals of QML, as documented in MIL-I-38535, follow:
- reduce overall cost of qualification
- reduce the time required between design and qualification
- reduce end-of-line testing through in-process controls
- maintain a high level of product quality and reliability
- improve device speed, density, and manufacturing cost
For more information about these programs, see the Government Qualification Programs
Appendix in this guide, or the actual MIL documents.
Whether a vendor is government qualified or not, when determining
a vendor's overall product quality and reliability capabilities, we
suggest the evaluation team review the following areas against all of
their present and future ASIC program requirements:
- process control
- material control
- tool control
- corrective action procedure
- testing and screening
- wafer lot acceptance
- fabrication and assembly
- environmental tests
- electrical characterization test
- product assurance program
- documentation
When evaluating a vendor for space ASICs, we recommend the team
also look at the quality aspects of the vendor's design methodology.
Conversely, if the ASIC design team will be following their own
methodology, examine it for the proper quality and reliability
support features.
In general, a quality design methodology has maturity and stability.
This means both the tasks and the tools used to carry them out have
produced many reliable designs and actual devices.
For system-level reliability considerations related to ASICs, see Appendix Seven:
"Reliability."
A design methodology for producing a quality ASIC design must
include tasks focused directly on reliability concerns. Quality and
reliability design work is closely tied to "producibility" --
creating a design that can be economically built. Design analysis and
design verification are the two major areas of ASIC design most
closely related to producibility, design quality, and reliability. The
evaluation team must evaluate the ASIC vendor's design
methodology for proper support of these functions.
Modifying a design at the very end of the design cycle may introduce
problems that occur too late to rectify, thus affecting quality and
reliability. Therefore, a vendor evaluation team must make sure that
the vendor's design methodology includes:
- Planning/partitioning: These tasks should accurately estimate an
ASIC design's physical size, thereby helping to minimize the need to
change the design to fit the original package or pin-count down the
road.
- Design rules check: Using the manufacturer's tools and processes,
this checks a design against the manufacturer's rules governing good
design. Some design rules checks take place at the layout (mask or
geometry) level of design, others at gate or cell levels of design.
Even if a design can be produced, it may still contain structures that
weaken over time due to various stresses, ultimately making an ASIC
fail. Therefore, a vendor evaluation team must make sure that the
vendor's design methodology includes:
- Worst-case analysis: This step looks at how a device will behave
over temperature, after radiation and other environmental stress;
after aging; and over the range of normal semiconductor processing
variations.
- Design rules check: This check not only helps make a device
producible, it can also ensure the device will be able to withstand
stress. Stress may cause a device deemed good at time of production
to fail later in life. Rules for maximum current density, fan-out,
fan-in, and clock distribution, for example, prevent stresses such as
electromigration, radiation and temperature from changing critical
device characteristics and causing an ASIC to fail.
- Support for test generation: A design methodology must make it
possible to economically create thorough tests for a device. These
tests will be used both during design verification and later during
production testing of the ASIC parts.
Tools must offer all needed functions for reliable design validation
and analysis. They must have a sufficient level of quality, meaning
maturity. Chapter 5 of this section,
"CAD Tool Analysis," provides in-depth tool
information.
A tool set must be both of sufficient quality and complete. New tools
always have the potential for introducing problems. Therefore, to
reduce potential problems, make sure the tool set is complete and
proven at the beginning of your ASIC program. Introducing a new
tool into a tool set late in a design cycle often results in a lack of
quality because the new tool presents problems when there is little
time to resolve the problem.
Tool Set Completeness
All tools needed to support the design methodology must be
available and show the required quality as described below. In
determining the completeness of a tool set, the evaluation team must
verify:
- The tool set has all functions required to support the design
methodology, including design, design analysis, design verification,
and test generation.
- The vendor has proper support available to document and
support fixes--rigorous use of a complex tool set will likely find
further bugs. The evaluation team must determine how quickly
those bugs can be fixed or worked around.
Tool Quality
The basic tools and interfaces used in a quality design methodology
have been available for some time. Tool bug fixes have matured to
the point where cosmetic fixes dominate. To evaluate basic tools and
interfaces, the evaluation team should obtain the following:
- Tool bug status: A recent bug summary from each of the tools'
vendors. Since vendors are sensitive about releasing details of bugs,
a summary report that lists the number of bugs by category of
seriousness will suffice. Again, the less serious bugs should
dominate.
- Tool training and support: Users of a good tool may produce a
low-quality design if they use the tool improperly. The vendor must
provide excellent initial training and continuing support to the tool
set users. The evaluation team needs to thoroughly review available
tool training and support.
- Demonstration of tool intercompatibility: A detailed description of
the use of all the tools working together in the proposed tool set
should be reviewed. This description should include:
- Use of a design at least as complex as the proposed ASIC(s)
- Demonstration of all needed interfaces between tools
- Successful interface to the vendor's production tester
Summary
- QML and QPL are the two government supported standard
qualification programs for microcircuits.
- A QML and QPL vendor status review determines your cost in
securing the required vendor quality and reliability information.
- The government originally created the QPL program to maintain
the high quality and reliability of discrete parts. QPL has been
extended to microcircuits for a number of years, but was only
recently extended to ASICs (gate arrays) through
MIL-M-38510/605, 606, 607, and 608 which define a generic
gate array qualification approach.
- From its inception, QML has been targeted at microcircuits and
describes qualifications for both standard cell and gate array ASICs.
- Design methodology must be closely examined for providing the
proper reliability analyses.
- Design tools must be closely examined for supporting reliability
analyses and a reliable design flow.